The Bailey Bridge is assembled simply by means of an excavator, and installed by launching on rollers or with the help of a crane.
Setting up in a natural environment is possible thanks to support plates and the addition of ramps to the ends.
Spans ranging from 9.14 linear metres to 64.00 linear metres without intermediate support for payloads up to 90 tonnes with a width of 4.22m.
A load test can be performed by an independent body before any use.
We work with large groups such as Bouygues Bâtiment (private renovation, construction), DV Construction, Vinci Construction, Chantiers Modernes, Spie Batignolles, Spie S.C.G.P.M ..
Contact by Email
Phone : +33(0)6 85 93 04 47
Le Puy - Lieu dit Fautrut
42440 Saint-Jean-la-Vêtre
Auvergne-Rhône-Alpes
FRANCE